← Back to IREX

Instrument Rating Exam · Mock exam

IREX.2.3.11Topic: Validity period of flight plans submitted to ATC.(clear)
Question 1 of 2
⏱ 120:00
General operational knowledgeValidity period of flight plans submitted to ATC.· medium

For how long does an IFR SARTIME/SARWATCH remain in effect after the proposed departure time if the aircraft has not departed?

0/2 answered